Preset-driven mission starting points · USCM8 · SSCM · NASA LOE · Blend v5 · All figures FY2025 $M
4 model families17 mission presetsFY2025 ROM outputs
Program Total
—
base cost
Cost to Customer: —
NRE Total—
RE Avg Unit—
Total RE (N)—
Cost / kg—
▾
Mission Archetype Presets
Browse quick-start missions from Class D tech demos through Class A flagships.
7 presetsNo preset loaded
Choose a starting point
Archetype presets load planning baselines sorted by mission class (A\u2192D). Historical references load real program specs for calibration. Use as starting points, not as-built truth data.
Changed: 0 fields
Showing top differences vs the loaded preset
No preset loaded
Program Parameters
Heritage Level
Mission Class
Program Posture
Production Qty (N)1 unit
Duration (months)36 mo
Fee & Reserves
Contractor Fee10%
Program Reserves25%
Customer = Base × 1.375
Active modelUSCM8Traditional · Mass-Driven
Current
Estimate OutputBlend v5 · Base —
Estimate Range
Floor-to-ceiling spread across all four models.
Cost by Subsystem
Detailed subsystem table
Subsystem Cost Shape
How each model distributes cost across subsystems — overlaid for pattern comparison